The prestressing construction technology of the main stadium in Guiyang Olympic Sports Center was introduced.
详细介绍了贵阳奥体中心主体育场整套预应力施工技术。
The full-scale joints were made to conduct collapse test for the top and bottom chords of the tubular space truss of the roof, which is based on the main stadium of Guiyang Olympic Sports Center.
针对贵阳奥体中心主体育场罩篷空间钢管桁架屋盖中的上、下弦相贯节点,进行了足尺节点破坏试验。
The main stadium in Guiyang Olympic Sports Center was composed of hyperboloid and spatial pipe truss structure. The complicated structure had high accuracy requirement and was difficult to measure.
贵阳奥体中心主体育场钢罩篷由双曲面空间管桁架结构组成,结构复杂,精度要求高,测量难度大。
The main stadium in Guiyang Olympic Sports Center was composed of hyperboloid and spatial pipe truss structure. The complicated structure had high accuracy requirement and was difficult to measure.
贵阳奥体中心主体育场钢罩篷由双曲面空间管桁架结构组成,结构复杂,精度要求高,测量难度大。