• Guide vane operation structure includes the guide vane arm clip board, guide vane arm, segmental keys, connection board, handle, cut pin, connecting rod pin and gland, etc.

    操作机构主要包括:导叶压板、导叶臂、分瓣连接耳柄剪断连杆压盖

    youdao

  • The wire (5) is brought into contact with the first guide pin (23), the second guide pin (24), and the third guide pin (25), when the wire (5) is fed around a reinforcing bar.

    钢丝5钢筋送出,钢丝(5)上述第一23)、第二导向销(24第三导向销(25接触

    youdao

  • The wire (5) is brought into contact with the first guide pin (23), the second guide pin (24), and the third guide pin (25), when the wire (5) is fed around a reinforcing bar.

    钢丝5钢筋送出,钢丝(5)上述第一23)、第二导向销(24第三导向销(25接触

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定