• To replace the relief valve disc, hold the upper guide fin and unscrew the diaphragm pressure plate.

    要更换安全阀阀瓣,握住上部引导翼,旋下隔膜压力板上的螺丝。

    youdao

  • The input and output use the standard rectangle wave-guide, the transition between rectangle wave-guide and fin-line is continuous gradual change line, and it has good capability of matching.

    开关的输入、输出使用标准矩形波导,鳍线和矩形波导之间采用连续渐变线进行过渡,匹配性能良好。

    youdao

  • Frosting fin on the design of a theoretical guide. and it can be extended to other heat transfer problems of fin.

    对结霜肋片的设计有一定的理论指导作用,并可以推广到其他类似的传热等问题中。

    youdao

  • The parameters of reflection coefficient magnitude and characteristic impedance are calculated. They are very useful for designing the wave guide to fin li...

    由此计算了阶梯鳍线反射系数的模值、特性阻抗等参数,为波导-阶梯鳍线变换段的匹配设计提供了有价值的参考。

    youdao

  • The parameters of reflection coefficient magnitude and characteristic impedance are calculated. They are very useful for designing the wave guide to fin li...

    由此计算了阶梯鳍线反射系数的模值、特性阻抗等参数,为波导-阶梯鳍线变换段的匹配设计提供了有价值的参考。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定