This paper is grounded on the project from Bohai Oilfield Services LTD in which the tubular joint's ice-induced fatigue strength of JZ20-2NW jacket platform is analyzed.
本文的课题背景系渤海石油公司JZ20-2NW导管架平台结构冰振疲劳计算项目。
This paper is grounded on the project from Bohai Oilfield Services LTD in which the tubular joint's ice-induced fatigue strength of JZ20-2NW jacket platform is analyzed.
本文的课题背景系渤海石油公司JZ20-2NW导管架平台结构冰振疲劳计算项目。
应用推荐