• To analyze the effect of the blind drainage system on the engineering characteristics of the ground improvement by gravel pile, the contrast tests were carried out on roadbed testing segment.

    为探讨盲沟排水对路基下碎石桩加固的软土地基的工程特性的影响,进行了路基试验段的对比试验,并在路堤填筑施工中进行了孔隙水压力和地基沉降测试。

    youdao

  • To analyze the effect of the blind drainage system on the engineering characteristics of the ground improvement by gravel pile, the contrast tests were carried out on roadbed testing segment.

    为探讨盲沟排水对路基下碎石桩加固的软土地基的工程特性的影响,进行了路基试验段的对比试验,并在路堤填筑施工中进行了孔隙水压力和地基沉降测试。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定