This paper aims designs the ground test system of direct-connect RBCC, and disposes of the experimental data.
本文就是针对这一有效的方法,进行了直连式RBCC发动机地面实验,对实验数据进行了处理。
This paper aims designs the ground test system of direct-connect RBCC, and disposes of the experimental data.
本文就是针对这一有效的方法,进行了直连式RBCC发动机地面实验,对实验数据进行了处理。
应用推荐