In coastal areas, the ratio of policy processing expenses to the total cost in 2002 has increased from 16% to 33% in 2008 in grid construction.
在沿海地区,电网建设政策处理费用占总成本的比例已经由2002年的16%上升到2008年的33%。
In the paper, we take advantage of power grid construction project as the research object, to study the whole process cost management.
论文以电网建设工程项目为研究对象,对其全过程造价管理进行深入的研究和探讨。
But in the construction and management of power grid project, the malpractice of high construction cost doesn't change due to the monopoly system.
但在电网项目建设管理中,因垄断体制造成建造成本居高不下的弊端仍然存在。
But in the construction and management of power grid project, the malpractice of high construction cost doesn't change due to the monopoly system.
但在电网项目建设管理中,因垄断体制造成建造成本居高不下的弊端仍然存在。