With the increasing capacity of wind power generators, the current impact on grid connection could not be ignored, thus the grid connection techniques should be investigated in depth.
随着风电机组单机容量的不断增大,发电机并网时的电流冲击已不能忽视,必须对并网控制技术进行深入研究。
In this paper, soft startup and impact suppression techniques are proposed to guarantee no voltage overshoots or sags in DC bus during startup and grid connection dynamic processes.
本文提出了一种软启动和并网冲击抑制技术以解决启动和并网过程中直流电压大幅波动的问题。
In this paper, soft startup and impact suppression techniques are proposed to guarantee no voltage overshoots or sags in DC bus during startup and grid connection dynamic processes.
本文提出了一种软启动和并网冲击抑制技术以解决启动和并网过程中直流电压大幅波动的问题。
应用推荐