The grey cluster method has been used for appraisal of the slope engineering rock mass of a gold ore mine.
利用灰色聚类方法对某金矿边坡工程岩体质量进行评价。
The grey cluster method has been used for appraisal of the slope engineering rock mass of a gold ore mine.
以西北某大型水电站地下厂房洞室群为例,在地质调查的基础上,对洞室群围岩岩体质量进行了分析评价。
It is shown that the extended grey cluster appraising method developed by us is generalized and is more flexible in decision than the traditional grey cluster method.
研究表明,本文提出的灰色聚类评价的拓展模型更具一般性和决策的柔性。
A new comprehensive evaluation model is established on the basis of the grey cluster method and by use of the characteristics of concordance priority index and disconcordance priority index.
以灰色聚类方法为基础,利用协调优先指标与非协调优先指标的性质,建立了一种新的综合评判模型。
A new comprehensive evaluation model is established on the basis of the grey cluster method and by use of the characteristics of concordance priority index and disconcordance priority index.
以灰色聚类方法为基础,利用协调优先指标与非协调优先指标的性质,建立了一种新的综合评判模型。
应用推荐