This paper adopts dynamic programming method and greedy method to solve such problems, then analyzes and compares the differences of two algorithms.
采用动态规划法和贪心法对该问题进行求解,分析和比较这两种算法在求解同一问题时的差异。
This paper introduces the concept about the question of job scheduling with time limit, a general method of solving this question using greedy method and a fast algorithm which is improved.
介绍了带有限期作业排序问题的概念,以及使用贪心方法求解此问题的一般算法和一种改进的快速算法。
This paper introduces the concept about the question of job scheduling with time limit, a general method of solving this question using greedy method and a fast algorithm which is improved.
介绍了带有限期作业排序问题的概念,以及使用贪心方法求解此问题的一般算法和一种改进的快速算法。
应用推荐