Different kinds of thermohydraulic phenomena during startup of gravity boron injection system (GBIS) of the 200MW nuclear heating reactor (NHR200) were described.
描述了200MW核供热反应堆(NHR-200)重力注硼系统启动时发生的各种热工水力学现象。
According to the sooner, center of gravity, to supervise the project supervision, earnestly perform their duties, ensure the construction engineering safety, photovoltaic heating.
要按照“关口前移、重心下移”的要求,要督促工程监理切实履职,确保基建、光伏、供热工程安全。
For the three-phase flow gravity heat pipe without built-in pipe, the equivalent convective heat transfer coefficient increases as the heating power increases.
对于无内置管的三相流重力热管,随着加热功率的增加,等效对流传热系数增大。
Glass was heated to its softening point and reshaped in mold under its gravity in heating furnace, then was sharp quenched by cold blast immediately.
重力钢化炉的成型、钢化主要是将玻璃加热软化,玻璃在重力作用下沿成型胎边框模周边下弯成型,再将玻璃由加热炉移至急冷设备风栅间淬冷钢化。
The Gas Analyzer measures the individual components and calculates physical properties such as specific gravity and heating value in approximately 100 to 160 seconds.
气体分析器测量个别成分,并且计算出物理性能(例如气体比重和热值)在大约100 - 160秒内。
The Gas Analyzer measures the individual components and calculates physical properties such as specific gravity and heating value in approximately 100 to 160 seconds.
气体分析器测量个别成分,并且计算出物理性能(例如气体比重和热值)在大约100 - 160秒内。
应用推荐