• Experimental studies on compound geomembrane during construction period are presented.

    并介绍了在施工过程中对复合土工膜的一些试验研究。

    youdao

  • The impervious PVC geomembrane liner is deployed over the dam face and anchored by welding to the PVC flaps.

    在坝面铺上防渗PVC土工膜衬垫,并与PVC膜片焊接固定在一起。

    youdao

  • The slide stability of the geomembrane against the interface, will directly effect on the safety of a project operation.

    斜坡面上土工膜与结构面的抗滑稳定直接影响到工程的安全运行。

    youdao

  • Using uniformity design theory and software, the machine to pave geomembrane lining on the trapezoid canal has been researched and tested.

    借助均匀设计理论和软件对防渗渠道塑膜铺衬机进行了试验研究。

    youdao

  • In strengthening of Baitukeng Reservoir, the dam slope was paved with composite geomembrane, while the dam foundation was paved with plastic film inv.

    在白土坑水库加固中,坝坡铺设复合土工膜,坝基进行垂直铺塑并将两者连为一体。

    youdao

  • The result of calculation manifests that the seepage state is improved and the storage capacity is enhanced after paving the composite geomembrane to the embankment dam.

    计算结果表明,土石坝铺设复合土工膜后,改善了渗流情况,提高了蓄水能力。

    youdao

  • A kind of complex geomembrane was laid in the upper layer of the roadbed to prevent water penetration, therefore the lower classed soil could be used as fill of embankment.

    利用二布一膜的隔水防渗特性,铺设在路基基床表层,改良路基填料。

    youdao

  • The coal and limestone storage yard must have a bottom impermeabilization system. This system may be constituted by a clay layer, a geomembrane layer, or other impervious material.

    煤料和石灰石存放场必须有底部防渗系统。该系统可由粘土层、地质处理用膜层、或其他防渗材料组成。

    youdao

  • A detailed introduction is given to the scheme, technical line, and design for reinforcement of the Shibianyu asphalt concrete dam and its construction with the composite geomembrane.

    介绍用复合土工膜加固石砭峪水库沥青混凝土斜墙坝的方案、技术路线和设计等。

    youdao

  • This paper introduced the geomembrane horizontal seepage prevention measures at the upper reservoir basin at Tai an pumped storage power station, as well as treatments to construction defects.

    介绍了泰安抽水蓄能电站上水库库盆采用的土工膜水平防渗措施及其施工缺陷处理,并对水库初期蓄水中的渗漏情况进行了简要的分析。

    youdao

  • This paper introduced the geomembrane horizontal seepage prevention measures at the upper reservoir basin at Tai an pumped storage power station, as well as treatments to construction defects.

    介绍了泰安抽水蓄能电站上水库库盆采用的土工膜水平防渗措施及其施工缺陷处理,并对水库初期蓄水中的渗漏情况进行了简要的分析。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定