• The time section made by mathematically simulating a geologic model offered from drilling data conforms better with factual data.

    根据钻井资料提供地质模型数学方法进行模拟所得的时间剖面实际资料有较好的吻合

    youdao

  • The essential differences between drilling geologic design of horizontal well and vertical well are "data encryption principle" and "two-time design principle".

    依据断块油藏地质特征开发阶段,优化水平井的地质设计和生产参数,保证水平井开发效果的关键

    youdao

  • The essential differences between drilling geologic design of horizontal well and vertical well are "data encryption principle" and "two-time design principle".

    依据断块油藏地质特征开发阶段,优化水平井的地质设计和生产参数,保证水平井开发效果的关键

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定