• In Three Gorges area, the No. 3 geologic hazard prevention involves 44 engineerings about reservoir bank. And the bank slump prediction is the very important basis of reservoir bank regulation design.

    三峡库区期地质灾害防治工程涉及到库岸工程有44处之多,预测整治设计重要依据

    youdao

  • In Three Gorges area, the No. 3 geologic hazard prevention involves 44 engineerings about reservoir bank. And the bank slump prediction is the very important basis of reservoir bank regulation design.

    三峡库区期地质灾害防治工程涉及到库岸工程有44处之多,预测整治设计重要依据

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定