• Once the utility power restores, the ATS generation outage unit and connects the public electrical network.

    一旦公用电力恢复,ATS停止发电机组重新连接公用电网。

    youdao

  • This paper presents an adaptive scheme that USES both frequency and rate-of-change of frequency measurements to dynamically set ULFS relays if more than one generation outage is experienced.

    介绍一种自适应型低频减载装置方案,它依据频率频率的变化率动态确定减负荷装置的动作情况。

    youdao

  • The drawbacks of the method for building generation system outage capacity model are analyzed.

    分析现有建立发电系统停运容量模型方法存在着计算繁琐的问题。

    youdao

  • A new concept, the generation system outage capacity probationary model, is presented. Based on this concept, a practical algorithm for building generation system outage capacity model is proposed.

    提出发电系统停运容量预备表的概念据此给出了先形成发电系统停运容量预备表,再建立发电系统停运容量模型的实用算法

    youdao

  • Perhaps nowhere is this concept feared more than in the power-generation industry, where scheduling a forced outage means less electricity, steam or heat for the production plant.

    也许发电行业这个词语最令人不安的,安排强制停机就意味着生产工厂所能得到的电力蒸汽供应减少

    youdao

  • Perhaps nowhere is this concept feared more than in the power-generation industry, where scheduling a forced outage means less electricity, steam or heat for the production plant.

    也许发电行业这个词语最令人不安的,安排强制停机就意味着生产工厂所能得到的电力蒸汽供应减少

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定