It realized rational general layout in narrow area by making use of abandoned excavated materials and overall construction site allocation in Longtan Hydropower Station.
龙滩水电站工程通过利用工程弃渣和统一调配使用场地,实现了狭窄坝区的施工总布置。
For the south side of the original site is Phoenix Mountain with luxuriant plants, the project design attempts to take it as the primary entry point of the general form layout.
因原有场地南侧为草木葳蕤的凤凰山脉,由此本案设计试图以之为整体形态布局的首要切入点。
For the south side of the original site is Phoenix Mountain with luxuriant plants, the project design attempts to take it as the primary entry point of the general form layout.
因原有场地南侧为草木葳蕤的凤凰山脉,由此本案设计试图以之为整体形态布局的首要切入点。
应用推荐