With the rapid hydroelectric development and in order to advance the construction management level of hydropower project, which needs to advance the general contract project.
随着我国水电事业的迅猛发展,为了提高水电工程建设管理水平,需要大力推进工程项目总承包机制。
This paper discusses the management model and operation process of general contract project item and analyzes the general contractors contract responsibilities and management system.
探讨了工程总承包项目的管理模式和运作过程,并在此基础上分析总结了总承包商的合同责任和管理体系。
Second, to probe into project's general management including management organization structure, risk management, contract management and information management from the angel of the whole project.
二是从项目整体的角度探讨项目综合管理的方法,包括项目管理组织模式,项目的风险管理,项目的合同管理,项目信息管理。
Revenue of long-term project contract (including labour service) shall be reasonably recognized, in general, according to the completed progress method or the completed contract method.
恒久工程(包括劳务)合同,一般理卖凭据完成进度法或者完成合同法雄道确认停业收进。
Project contract and general sales and purchase contracts have what differentiation?
项目合同和一般的销售和购买合同有什么区别?
The Project Manager has full rights to represent our company to fulfill the engineering contracting contract and conduct the general management during the construction.
项目经理全权代理公司履行工程承包合同,对工程进行全面管理。
This thesis introduces to us Taiyuan airport reconstruction and extension project and discusses types of the plan for general contract management as well as establishment contents and requirements.
结合太原机场改扩建工程项目探讨了总承包管理任务规划的类型和编制的内容及要求。
On the other hand, in order to obtain larger market share and to get more benefits for owners, the enterprises should provide project management and general contract service.
另一方面,工程咨询企业要获得更大的市场份额,为业主创造更多效益,就必须推进项目管理和工程总承包服务。
National house architectural project construction contract first grade qualification enterprise …General contractor class A enterprise of national housing …
翻译请问下“国家房屋建筑工程施工总承包壹级企业”这句话翻…
Reinforced concrete structure (industrial plant-based) structural design and reinforcement; With the general manager of a tender offer to participate in the project contract negotiations;
钢筋混凝土结构(工业厂房为主)结构设计与加固;配合总经理进行投标报价,参与项目合同的谈判;
WHEREAS party A have, with the Owner, concluded the general contract of engineering construction which is inclusive of cable trench project needed professional constructor to complete;
鉴于甲方与建设单位签订了工程建设总包合同,其中包括电缆沟施工项目需要专业施工分包人完成;
BOQ existing valuation methods, the project completed by the contract price settlement in general, materials transfer and visa poor claim is composed of three parts.
现行的工程量清单计价方法,工程竣工结算一般由合同价、材料调差及签证索赔三部分组成。
BOQ existing valuation methods, the project completed by the contract price settlement in general, materials transfer and visa poor claim is composed of three parts.
现行的工程量清单计价方法,工程竣工结算一般由合同价、材料调差及签证索赔三部分组成。