• Through hydraulic model tests, the spillway crest profile was optimized so as to achieve the required capacity on one hand and to minimize the cost of the spillway crest and the new gate on the other.

    通过水工模型试验一方面优化溢洪道顶部轮廓一方面降低溢洪道顶部改造闸门成本

    youdao

  • Through hydraulic model tests, the spillway crest profile was optimized so as to achieve the required capacity on one hand and to minimize the cost of the spillway crest and the new gate on the other.

    通过水工模型试验一方面优化溢洪道顶部轮廓一方面降低溢洪道顶部改造闸门成本

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定