Thanks to a 30% federal tax credit, that works out as much the same as a combined-cycle gas-turbine plant-but without the noise and fumes.
这和我们国家用30%的税收建成的一座联合涡轮燃气发电厂的产能一样,不同的是,人家不产生噪音和废气。
The efficiency of a coal-fired thermal plant is typically in the range of 30%-35%. In a combined cycle gas turbine system running on natural gas, the maximum efficiency is in the range 45%-50%.
烧煤的热电厂的效率通常在30%到50%之间,使用天然气的联合循环燃气轮机系统最大效率在45%到50%之间,而很多专家认为高温燃料电池的效率可达到80%至85%。
Take the natural gas booster station built in 9e class gas turbine combination cycle power plant for example, its function and system constitution were introduced and analyzed.
以9e级燃机联合循环电厂所配置的增压的天然气调压站为例,介绍和分析其功能和系统组成,为国内同类项目的建设提供参考。
The sound reduction hood is mainly used in gas turbine, steam turbine, air separation plant, air compressor, generator set and other large-scale equipment for noise control.
主要用于燃气轮机、蒸汽透平机、空分设备、空压设备、发电机组等大型设备的噪声治理。
The paper introduces several utilization ways of coke-oven gas and emphatically expiates the application of heat-power coordinated supply technology of gas turbine at Yangquhe Coking Plant.
本文介绍几种焦炉煤气的利用途径,重点阐述了燃气轮机热电联供技术在羊渠河焦化厂的应用。
House load operation of gas turbine is described as an operation with station-service power under the condition of disconnection to main power grid, which can make a power plant operate safely.
燃气轮机的小岛运行是指燃气轮机在与主电网解列的情况下,带厂用电运行,从而保证了电厂的安全运行。
It shows that the algorithm of global predictive control with self-adaptive can better control the output of the speed of the gas turbine of the nuclear power plant and get the better control effect.
表明所采用的广义预测自校正控制算法能够较好的控制核动力蒸汽轮机转速的输出,可以获得较好的控制效果。
By analyzing the electrical single line of Shenzhen Qianwan LNG Power Plant, some reference is provided for future electrical design of 350mw combined cycle gas-steam turbine units.
通过对深圳前湾燃机电厂电气主接线的分析,为今后350MW级燃气蒸汽联合循环机组电气设计提供借鉴。
This paper describes the condition of combustion chambers of No. 1 gas turbine burned in Zhenghai Power Plant, analyses the cause of this failure and gives some countermeasures.
简要叙述了镇海1号燃机燃烧筒烧损的现象并分析了原因,提出了相应的防范措施。
Presents the baking of the combustion gas turbine flue and Primary reformer air chute of the second stage ammonia plant in CNOOC Fudao Chemical co., Ltd., explains and summarizes the baking process.
介绍中海石油化学有限公司富岛二期合成氨装置燃气轮机烟道以及一段炉风道的烘炉过程,对烘炉过程进行说明和总结。
The method of utilizing afterheat of power plant in producing mixed gas includes heating air in a heat exchanger with the steam the turbine exhausts;
本发明公开了一种利用电厂余热制造混合煤气的方法,首先将发电汽轮机排出的蒸汽经过热冷交换器把常温的空气加热;
Demolish and remove all plant equipment and associated facilities of the two gas turbine units TG1 and TG2 inside Tsing Yi Power Station.
清拆及运走位于青衣发电厂的一号及二号涡轮机组的所有设施及有关设施。
Demolish and remove all plant equipment and associated facilities of the two gas turbine units TG1 and TG2 inside Tsing Yi Power Station.
清拆及运走位于青衣发电厂的一号及二号涡轮机组的所有设施及有关设施。
应用推荐