• The outburst risk index and gas gush feature are analysed during roadway progress. The result proves that the effectiveness of zonal gas pre-drainage by cross-measure boreholes.

    消突效果检验后进行煤巷掘进,掘进期间通过突出危险性指标瓦斯涌出参数分析,验证穿层钻孔区域预抽瓦斯消突技术的有效性

    youdao

  • The hole enlargement by high - pressure water jet provided a feasible technical way for raising gas drainage effect from coal seam in low permeability and improving the effect of outburst pre...

    高压射流提高透气性煤层瓦斯抽放效果扩大防措施的效果提供了一个可行技术途径

    youdao

  • The measurement method is demonstrated valid in outburst elimination by the examination of remnant gas pressure, pre-drainage rate and the zonal verification during the coal roadway driving.

    残余瓦斯压力检验以及掘进期间区域验证,均证明方法布置的预抽钻孔突效果有效

    youdao

  • The measurement method is demonstrated valid in outburst elimination by the examination of remnant gas pressure, pre-drainage rate and the zonal verification during the coal roadway driving.

    残余瓦斯压力检验以及掘进期间区域验证,均证明方法布置的预抽钻孔突效果有效

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定