At last, it studies the fuzzy duration-cost optimization of decision network planning.
最后,对模糊决策网络计划工期—成本优化方法进行了探讨。
Based on credibility theory and two-stage fuzzy optimization method, this paper presents a new class of fuzzy production planning model.
基于可信性理论和两阶段模糊优化方法,提出一类新的模糊生产计划模型。
This paper focuses on a fuzzy approach in modeling and optimization for aggregate production planning problems with multiproduct under fuzzy requirements and fuzzy capacities environment.
提出具有模糊需求量和模糊能力约束以及资本水平约束的多品种类集约生产计划问题的模糊优化模型及模糊解方法。
Given the stochastic and ergodic characteristics of fuzzy variables, a chaos optimization algorithm is introduced to solve the planning problem.
结合混沌变量的随机遍历特性,将混沌优化算法应用于输电网非线性混合整数规划模型的优化求解。
Production planning with fuzzy unit profits, fuzzy capacities and fuzzy demands is descried, and an optimization model is formulated by using fuzzy chance-constrained programming.
描述了模糊单位利润、模糊生产能力以及模糊需求下的批量生产计划,并应用模糊机会约束规划规划建立了模型。
Production planning with fuzzy unit profits, fuzzy capacities and fuzzy demands is descried, and an optimization model is formulated by using fuzzy chance-constrained programming.
描述了模糊单位利润、模糊生产能力以及模糊需求下的批量生产计划,并应用模糊机会约束规划规划建立了模型。
应用推荐