A new approach of fault diagnosis using neuro-fuzzy network is proposed.
提出了一种应用模糊神经网络进行故障诊断新方法。
Using the methods of subtraction clustering and auto-adapted nerve fuzzy network, a sort of motion planner for the underwater vehicle is designed.
使用减法聚类和自适应神经模糊网络方法设计了一种水下机器人运动规划器。
Due to the traits of nonlinear, capacity of study, adaptivity and anti-interference, neural-fuzzy network is suitable for the control of ramp metering.
鉴于模糊神经网络具有良好的非线性特性、学习能力、自适应能力和抗干扰能力,本文将模糊神经网络技术引入到高速公路入口匝道控制中。
In the process of optimization of network, we first change the fuzzy network into average network, then optimize the average network and change it back to the fuzzy network.
在网络优化方面,先将模糊网络图转化为均值网络图,对均值网络进行优化后再还原为模糊网络图。
At the same time, compute all the path criticalities by utilizing the relationship between the critical path of interval networks and the path criticality of the fuzzy network as well.
同时利用截集区间网络关键路径与模糊网络关键度的关系,计算出所有路径的关键度。
And it also presents an example calculation of optimizing minimum cost time limit for fuzzy network to explain this new method.
给出了一个模糊网络最低成本日程优化的实例计算,通过实例计算说明了计算的新方法。
Based on the study of calculating approaches of fuzzy network, this paper puts forward a new method to calculate the parameters and determine the critical path of fuzzy network planning.
基于对模糊网络计算方法的研究,提出了新的网络参数计算和关键线路判断方法。
The control for speed limit on expressway is a nonlinear and time variable system, it is difficult to simulate with a mathematical model. A neuro-fuzzy network is proposed to solve the problem.
高速公路限速控制是一个非线性时变系统,难于用数学模型准确建模,提出一种模糊神经网络实现限速控制。
According to the problems above, this paper analyzes the uncertain factor of the project, fully studies the practical problems of the fuzzy Network planning's using in construction.
针对上述问题本文通过对项目实施过程中不确定因素的分析,全面地研究了模糊网络计划在工程施工中的应用问题。
According to the problems above, this paper analyzes the uncertain factor of the project, fully studies the practical problems of the fuzzy Network planning's using in construction.
针对上述问题本文通过对项目实施过程中不确定因素的分析,全面地研究了模糊网络计划在工程施工中的应用问题。
应用推荐