The DOE would oversee Future Gen and pay 74% of the costs; a group of energy companies, called the Future Gen Alliance, would pay for the rest and design, build and manage the project.
美国能源部原计划要监管Future Gen并且支付74%的费用;由几家能源公司组成的Future Gen联盟将支付其余的资金并设计、建造和管理该项目。
The DOE would oversee Future Gen and pay 74% of the costs; a group of energy companies, called the Future Gen Alliance, would pay for the rest and design, build and manage the project.
美国能源部原计划要监管Future Gen并且支付74%的费用;由几家能源公司组成的Future Gen联盟将支付其余的资金并设计、建造和管理该项目。
应用推荐