• Where permanent formwork is incorporated in the structure extra care is required, as full compaction of the concrete cannot be checked after the formwork is removed.

    使用永久模板时,应特别小心因为移掉模板能够检查混凝土是否完全压实

    youdao

  • PRINCIPLE This Method describes the procedure for determining the time required for a sample of fresh concrete to achieve full compaction when subjected to a standardized vibratory action.

    原则方法确定了在标准振荡作用下,混凝土拌合样本达到完全压实状态所需时间的测定程序

    youdao

  • For a dynamic compaction test on a collapsible loess site, the medium sinkage was obtained by statistics of main ramming, interval ramming and full ramming.

    某湿陷性黄土地基场地强夯试验通过主夯沉降量统计获得场地平均下沉量;

    youdao

  • For a dynamic compaction test on a collapsible loess site, the medium sinkage was obtained by statistics of main ramming, interval ramming and full ramming.

    某湿陷性黄土地基场地强夯试验通过主夯沉降量统计获得场地平均下沉量;

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定