Framing a feasible test plan to evaluate the working life reliability of such components within limited test period is urgently required in engineering practice.
工程中迫切需要制定合理可行的验证试验方案,在有限的试验周期内验证产品的可靠性是否符合指标要求。
The house is named House 50 50 —in reference to its half-indoor, half-outdoor design—and is L-shaped in plan, framing a driveway at the property's entrance.
该住宅名为House50 50——参考其半室内、半室外的设计——布局呈L形,住宅的入口处设置了一个车道。
The house is named House 50 50 —in reference to its half-indoor, half-outdoor design—and is L-shaped in plan, framing a driveway at the property's entrance.
该住宅名为House50 50——参考其半室内、半室外的设计——布局呈L形,住宅的入口处设置了一个车道。
应用推荐