• The fracturing base fluid confected on the best condition applied in spot fracture construction has attained best effect, and altered the oil floor.

    优化条件配制的压裂基液投入现场压裂施工应用后,效果显著,达到了对油层改造的目的。

    youdao

  • The fracturing base fluid confected on the best condition applied in spot fracture construction has attained best effect, and altered the oil floor.

    优化条件配制的压裂基液投入现场压裂施工应用后,效果显著,达到了对油层改造的目的。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定