The time span of middle-term optimization model equal foreseeable period of runoff forecasting (3 to 7 days), and the optimization period is one day.
中期模型优化的时间跨度等于中期入库径流预报的预见期(3-7天),优化时段为一天。
The time span of middle-term optimization model equal foreseeable period of runoff forecasting (3 to 7 days), and the optimization period is one day.
中期模型优化的时间跨度等于中期入库径流预报的预见期(3-7天),优化时段为一天。
应用推荐