If a previous checkpoint is already in progress, the checkpoint forced by the log switch will override the current checkpoint.
如果先前的检查点已经在进行中,由日志切换引起的检查点会覆盖当期的检查点。
If a previous checkpoint is already in progress, the checkpoint forced by the log switch will override the current checkpoint.
如果先前的检查点已经在进行中,由日志切换引起的检查点会覆盖当期的检查点。
应用推荐