Through the experimental research, the rationality of setting up the sediment flushing tunnel before the intake is ascertained, and a detail scheme for the reservoir control is made up.
通过模型试验研究,肯定了拉沙洞前置的合理性;确定了水库调度的具体方案;并由右岸拉沙底孔的拉沙效果提出加设机组的构想。
The right bank spillway tunnel at Lubuge hydropower station is the most important passageway of water discharging and sediment flushing.
鲁布革水电站右岸泄洪洞承担着鲁布革大坝泄洪、排沙、放空水库的任务,是最重要的泄洪、排沙通道。
The right bank spillway tunnel at Lubuge hydropower station is the most important passageway of water discharging and sediment flushing.
鲁布革水电站右岸泄洪洞承担着鲁布革大坝泄洪、排沙、放空水库的任务,是最重要的泄洪、排沙通道。
应用推荐