• For serious formation leakage, the working fluid can't carry sand column to ground surface in the process of sand washing.

    由于地层漏失严重,作业冲施工过程工作无法将井筒内的携出地面

    youdao

  • Through continuous automatical adjustion of the paragraphs fluid volume, ground sand concentration, proppant type and size and so on, the software finally designs fracturing process.

    通过不断自动调整各段防砂液体积、地面加砂浓度支撑剂类型粒径设计出压裂施工程序

    youdao

  • Through continuous automatical adjustion of the paragraphs fluid volume, ground sand concentration, proppant type and size and so on, the software finally designs fracturing process.

    通过不断自动调整各段防砂液体积、地面加砂浓度支撑剂类型粒径设计出压裂施工程序

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定