• Flow-shop scheduling problem is known to be notoriously intractable, both in theory and practice.

    流水作业调度问题理论实践方面一个著名的难题。

    youdao

  • Then, found its application in flow shop scheduling problems with two objects.

    应用算法解决了双目标的流水车间调度问题

    youdao

  • An ant colony optimization based algorithm for permutation flow shop scheduling was proposed.

    提出一种求解置换流水车间调度优化算法

    youdao

  • According to ants' routing behavior model and its resemblance to hybrid flow shop scheduling, an ant-like scheduling algorithm for hybrid flow shop is put forward.

    根据蚂蚁路径寻优行为模型及其车间调度的相似性,提出混流车间蚂蚁调度算法

    youdao

  • No-wait flow shop scheduling problems with total flow time minimization is an important manufacturing system widely existing in industrial environments.

    完工时间目标的无等待流水车间调度问题一个重要制造加工系统广泛应用于工业生产中。

    youdao

  • A new evolutionary algorithm for solving multi-objective hybrid flow shop scheduling problem(HFSP) which is an important topic in supply chain network optimization is presented.

    针对供应链网络优化领域中的混合流水作业调度问题提出一种新的目标演化优化算法

    youdao

  • Flow shop scheduling problems.

    流水作业排序问题

    youdao

  • For the difficulties of flexible flow shop(FFS)dynamic scheduling problem, the problem's character is analyzed, and the model of the problem is built.

    针对柔性流水车间动态调度求解困难问题首先分析调度问题特征构建问题模型

    youdao

  • A hybrid flow shop scheduling problem with no-wait is derived from the optimal matching of furnaces and machines in steel making casting production.

    炼钢连铸生产计划优化匹配问题归结为个不允许等待混合流水车间排序问题来进行研究,提出了一个启发式算法-最小偏差算法。

    youdao

  • According to ants "routing behavior model and its resemblance to hybrid flow shop scheduling, an ant-like scheduling algorithm for hybrid flow shop is put forward."

    根据蚂蚁路径寻优行为模型及其车间调度的相似性,提出混流车间蚂蚁调度算法

    youdao

  • This concept is the integration of identical parallel machine scheduling with flow shop scheduling. The solution to IFSP is a non- polynomial computation of time problem.

    采用网络理论构造平行流水作业连接图模型,提出了采用群算法求解平行流水作业计划问题,以及求解过程可行路径表的建立方法

    youdao

  • The Flow shop scheduling problem under simple linear deterioration was considered.

    讨论工件具有线性恶化加工时间的调度问题

    youdao

  • The Flow shop scheduling problem under simple linear deterioration was considered.

    讨论工件具有线性恶化加工时间的调度问题

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定