• Sometimes, we meet him in our bed, and another time, he will be on the floor or shinning the bed pillar.

    有时相遇,在另一个时间,你就发觉地板上或是正床柱子

    youdao

  • The wall slewing crane requires no floor space, can be mounted on load-bearing concrete walls, pillar or machines with easy installations.

    墙壁悬臂占用地面面积可以安装在墙上,厂房立柱上机器设备上,其固定方式十分简单

    youdao

  • Pick up the WELDING TORCH on the floor next to the right arch pillar.

    旁边地板上权利支柱

    youdao

  • Roof falling, floor heave of roadway and pillar failure are important problems of rock mechanics in mining process.

    顶板冒落、巷道矿柱破坏采矿过程中的重要岩石力学问题

    youdao

  • In the design of the facade, glass curtain wall is used in the ground floor. Standard Windows, half size of the floor height and pillar distance, are used for the standard floors.

    立面形式上,底层大厅为通高玻璃窗标准采用半个柱网层高标准开窗楼梯间微微前倾增加建筑动感。

    youdao

  • The horizontal distance X between roadway and the edge of its upper pillar is an important parameter for roadway layout in floor strata and adjacent coal seams.

    巷道上部煤柱边缘之间水平距离X底板岩巷邻近煤层巷道布置重要参数

    youdao

  • Deficient floor slope Angle of an ore body often needs to dig a drift (or access) in its footwall rock when adopting non-pillar sublevel caving following-vein excavation.

    采用沿脉布置无底柱分段崩落法,矿体底板倾角不足时,需要下盘岩石开掘进路

    youdao

  • With numerical simulation method, the distribution law of coal pillar support pressure in the floor was studied.

    运用数值模拟分析方法,研究煤柱支承压力底板分布规律

    youdao

  • The floor roadway should be located out of the abutment stress zone when protection coal pillar is retained, or the working face should be pushed away for enough distance under overhead mining.

    留设保护煤柱底板岩巷位于集中应力区的外侧跨采时工作面足够距离,使巷道靠近采空区应力恢复区的下方。

    youdao

  • Can be seen surrounding rock structure of the typical pattern of damage to the roof and floor of bending damage and a broken pillar along the main damage to the weak side slip.

    可见采场围岩结构典型破坏模式底板弯曲折断破坏矿柱沿滑移破坏为主

    youdao

  • The influence to the coal floor and the overlying rock with different coal-pillar width is analyzed and compared;

    通过理论数值模拟综合比较得出合理的煤柱宽度

    youdao

  • The influence to the coal floor and the overlying rock with different coal-pillar width is analyzed and compared;

    通过理论数值模拟综合比较得出合理的煤柱宽度

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定