• The main methods for calculating designed flood are probable maximum precipitation and hydrologic frequency analysis.

    设计洪水计算方法主要可能最大降雨水文频率

    youdao

  • Nowadays, there is still no normative method for ascertain of the local probable maximum flood combination.

    目前我国有一套较完整规范地推求可能最大洪水地区组成计算方法

    youdao

  • Analysis of flood release capacity of upstream detention areas and the probable maximum flood reveals that the risk of levee-breach in Harbin city still exists.

    哈尔滨上游蓄滞洪区的分洪能力以及可能发生最大洪水进行了计算和分析,得出结论认为哈尔滨市未来仍有发生溃堤的可能。

    youdao

  • Analysis of flood release capacity of upstream detention areas and the probable maximum flood reveals that the risk of levee-breach in Harbin city still exists.

    哈尔滨上游蓄滞洪区的分洪能力以及可能发生最大洪水进行了计算和分析,得出结论认为哈尔滨市未来仍有发生溃堤的可能。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定