• The flood risk rate, which is caused by driven up different scheme of flood control limiting level, is assessed adopted the staged operation scheme.

    采用水库分期运用方案,对不同频率入库洪水不同汛限水位造成洪灾风险进行了估计

    youdao

  • The flood risk rate, which is caused by driven up different scheme of flood control limiting level, is assessed adopted the staged operation scheme.

    采用水库分期运用方案,对不同频率入库洪水不同汛限水位造成洪灾风险进行了估计

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定