SB 14 is in flight test at Edwards Air Force Base, Calif., and will be delivered to the Air Force in 2011.
SB14 轰炸机在加利福尼亚州爱德华兹空军基地进行飞行测试,并将于2011年交付空军。
In the 1890s, Lawrence Hargrave invented the box kite to test ideas about flight.
19世纪90年代,劳伦斯·哈格雷夫发明了盒子风筝来测试有关飞行的想法。
The FIDL aircraft is also in flight test at Edwards.
FIDL飞机也在爱德华兹空军基地进行飞行测试。
Future phases of the program will include the development of a real-time prototype collaborative navigation system and a flight test demonstration.
该项目的未来阶段将包括研发一个实时协同导航系统样机并进行飞行测试演示。
This was the first in a series of tests as part of the U.S. Navy/Marine Corps/Lockheed Martin demonstration flight test program.
这是美国海军/海军陆战队/洛克希德·马丁公司演示飞行测试计划的一系列测试之首。
During flight test, Boeing must ensure the plane is safe and efficient at full forward and full aft CG as well as any combination between the two.
在飞行检测的时候,波音必须确保在重心在靠前、靠后,或者在前后之间的时候,飞机仍然安全有效。
The first flight test will take place in 2011 and weapons capabilities will be simulated.
该机的首次飞行测试将在2011年进行,而攻击能力测试采用模拟的方式进行。
Boeing also performed an extensive flight-test program to validate the system's design and development.
波音公司还进行了大量的飞行试验计划,以验证系统的设计与开发。
The second Airbus Military A400M, known as MSN2, has run all four of its Europrop International (EPI) TP400 turboprop engines in a series of trials after being handed over for flight test.
第二架第二架空客军事运输机a 400m(即msn2)在飞行测试后一系列的试验中,启动了自身全部EPI TP400涡轮发动机。
Prime Contractor Lockheed Martin is gearing up for a flight test of the F-35B demonstrator aircraft, known as BF-1, possibly before 6 June, according to Lockheed Martin spokesman John Smith.
主承包洛克希德·马丁公司发言人约翰·史密斯称,洛克希德·马丁公司正在准备F - 35 B演示样机BF - 1的飞行测试,该测试有可能于6月6日前进行。
"When you do flight test, the desire is" to discover any possible problems with the aircraft, the official said June 2.
该官员6月2日说,“当你做飞行测试,期望是”发现飞机可能存在的问题。
The four-star's confidence in the embattled program has been boosted because the plane is considerably ahead of its flight test schedule for this year.
Schwartz说,在该四面楚歌计划中的“四星”自信已经被强化,因为该飞机今年的飞行试验计划已经大大提前。
The longest previous hypersonic scramjet flight test, performed by a NASA X-43 in 2004, was faster, but lasted only about 10 seconds and used less logistically supportable hydrogen fuel.
先前最长的冲压式喷气发动机下极超音速飞行测试,是在2004年由NASA的X-43进行的,速度更快,但只持续了10s。
The B-1 Fully Integrated Data Link (FIDL) flight test plan for Phase 1 concluded Oct. 16; it included nine sorties performed by the U.S. Air Force at Edwards Air Force Base.
这架采用全集成数据链(FIDL)的B-1轰炸机于10月16日结束第一阶段测试,其中包括在美国空军爱德华兹空军基地进行了9架次飞行。
“It gives you a sense of the scale of what NASA does that our flight test rocket is larger than any other rocket in the world,” Ares I-X deputy mission manager Jon Cowart told SPACE.com.
“这会让你觉得NASA的飞行试验火箭比世界上任何其他的火箭都要大,”战神I-X的副项目主管Jon Cowart告诉SPACE.com。
The remaining software flight-test objectives (emphasizing data link functionality) will be performed during Phase 2, which is scheduled to begin at Edwards in April 2010 and run for 10 months.
其余软件飞行测试目标(注重数据链功能)将在第二阶段进行,即于2010年4月在爱德华兹空军基地进行,为期10个月。
The flight test was conducted in the challenging high altitude environment required for refueling of high altitude long endurance (HALE) unmanned aircraft systems (UAS).
这次飞行测试是在充满挑战的高空环境下进行的,这也是高空长航(HALE)无人机(uas)加油所需的环境。
This is a major step toward completing the second of the program’s two Low Power System Integration-Active Flight Test knowledge points, the first of which was accomplished earlier this month.
这向着项目第二个“低能量系统主动集成飞行测试知识点”迈出了重要一步,首个知识点已经于本月早些时候完成。
The implementation of a complete non-intrusive flight test system is both difficult and beyond the scope of this paper.
完全实现一个非侵入性的飞行测试系统,实属不易,并且超越了本文的范围。
We've incorporated numerous lessons learned from previous programs on the layout of these displays and on the operation of these flight test critical controls.
我们已经将以往项目中得到的关于安排这些显示屏位置的大量经验应用于这些飞行测试中的临界控制。
In a key risk reduction flight test, Northrop Grumman's Proteus test aircraft and a NASA Global Hawk flew as close as 40 feet apart at an altitude of 45,000 feet, an industry-setting record.
在飞行试验中,诺斯罗普·格鲁门公司的一架Proteus试验机和美国航天局的一架全球鹰飞行在13716米(4.5万英尺)的高空,距离接近12.2米(40英尺),创造了行业纪录。
The programme planner decided to go ahead with the full-range flight test as scheduled.
计划规划者决定前进进行全射程飞行测试作为试验进度表。
Preparation for the flight test began in late 1987.
在1987年后期开始准备飞行测试。
The two flight test objectives not met were considered to be minor and will be the first to undergo investigation at the start of the New Year.
没有达到的这两个飞行试验目标被认为是次要的,将在新年的开始首先接受调查。
The two flight test objectives not met were considered to be minor and will be the first to undergo investigation at the start of the New Year.
没有达到的这两个飞行试验目标被认为是次要的,将在新年的开始首先接受调查。
应用推荐