If you have special requirements, test pressure exceeds 0.5mpa, the matching manufacture fixture is fixed on the heat exchanger tube plate, pushing pressing head test.
若有特殊要求试验压力超过0.5MPa时,可制做配套夹具固定在换热器管板上,推压枪头进行试验。
If you have special requirements, test pressure exceeds 0.5mpa, the matching manufacture fixture is fixed on the heat exchanger tube plate, pushing pressing head test.
若有特殊要求试验压力超过0.5MPa时,可制做配套夹具固定在换热器管板上,推压枪头进行试验。