• Method The initial step is to install an external fixation support, properly pressed, on the outer fore-tibia, and then to place minimally invasive plate, properly fixed, on the inner fore-tibia.

    方法胫骨前外侧置放固定架并适当加压,然后在胫骨前内侧置放微创钢板固定

    youdao

  • In a fixed formal context, the method to construct concept lattice by adding attributes step by step is investigated.

    研究给定形式背景下通过逐步添加属性建造概念方法

    youdao

  • Based on the discrete-event simulation theory, the visualization and simulation of concrete dam construction system is developed by means of fixed time-step method.

    基于离散事件仿真理论混凝土施工系统可视化仿真开发通过固定时间步长法。

    youdao

  • Based on the discrete-event simulation theory, the visualization and simulation of concrete dam construction system is developed by means of fixed time-step method.

    基于离散事件仿真理论混凝土施工系统可视化仿真开发通过固定时间步长法。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定