Better logic for firing events and doing the actual event?
触发事件和实际事件做更好的逻辑?
However, if you have two elements where there is no direct parent-child relationship and they do not lie on the same level in the tree structure, their event firing sequence is not fixed.
但是,如果您拥有两个没有上下级关系的元素,而且它们在树形结构中不是同一层次,那么它们的事件引发序列就是不同的。
The trigger can be a property firing, clicking the minimal UI (for example, a button), or some other event.
通过单击最小UI(例如,按钮)或其他事件,触发可以是一种属性触发。
The interactions are initiated by firing a signal or message that corresponds to some business-domain event.
通过触发对应于某些业务领域事件的信号和消息,来启动交互。
Indeed, after firing an event, the parser forgets about it.
实际上,激发一个事件后,语法分析器就将其忘记。
Raising or firing an event means calling the handler.
发生或触发一个事件意味调用这个事件处理器。
The event firing sequence for the ReportItem and ReportDesign events is different in the runtime environment, because there are several phases during the report building.
ReportItem与ReportDesign事件的事件引发序列在运行时环境中是不同的,因为在报表构建期间有几个阶段。
This could potentially result in the Elapsed event firing even after the Stop method has been called.
这会潜在的导致消失事件被引发即使其Stop方法已经被调用。
Notice that the test automation simulates a button click by directly invoking the button control's associated method rather than by firing an event.
请注意,测试自动化是通过直接调用按钮控件的相关方法模拟按钮单击的,而不是通过触发事件模拟。
The event firing sequence of the elements on the report base shows the elements relative position.
报表基底上元素的事件序列显示了相关的位置。
We can make use of the event firing sequence to sum up and calculate the data.
我们可以使用事件序列来总结和估算数据。
While the Total Balance Time and the Total Extra-plan Time cannot be summed up easily, the event firing sequence of the elements contained in the report can help us resolve this challenge.
虽然总平衡时间和总extra - plan时间不能进行轻松地总结,但是报表中所包含的时间发生序列,可以帮助我们解决这个难题。
SOLVED - Why is my KEY_UP event firing for the key I just pressed when I quickly switch keys?
名称——为什么我KEY_UP事件发射的关键时我只是按我快速切换键吗?
The description of the process model consists of the concurrent and dependent relationships of activities, activity firing conditions, event sequences and document management.
该模型描述了活动的并发执行和依赖关系、活动激发的条件、事件顺序及文档管理等信息。
The description of the process model consists of the concurrent and dependent relationships of activities, activity firing conditions, event sequences and document management.
该模型描述了活动的并发执行和依赖关系、活动激发的条件、事件顺序及文档管理等信息。
应用推荐