The finished cable will be easy to transport and install because of light weight.
减轻电缆重量,便于运输和网络施工,减轻工人劳动强度;
Finished cable should have factory name (code No.), type, voltage and other marks which should be resistant to wear.
成品电缆应有制造厂名(代号)、型号和电压等标志,标志应耐擦。
After the completion of 10-m HTS power cable in 2003, the building, commissioning and electrical test of 75-m HTS power cable have been finished in the end of 2004.
在继2003年完成10米三相高温超导电缆之后,我们于2004年年底成功完成了75米高温超导电缆的组装、调试和通电试运行。
The connection cable will probably not be finished until next year.
连接电缆到明年以前不可能完工。
Based on the basic concept of the un-deformed pretension of cable, the optimization model of finished state with multi-objective and multi-constraint is used.
基于不变形预张力的基本概念,建立了斜拉桥成桥状态的多目标、多约束的优化模型,并通过有限元程序求解成桥索力。
When the amusement park wasn't finished, I worked in the construction company then, and I was familiar to every equipment in its room. I know how to stop electricity of the cable car.
之前那个游乐场还没盖好的时候,我刚好在里面的工程公司上班,它机房里面的设备我非常的熟,我知道怎么让那个缆车断电。
Being asymmetric, it's more complex to determine the reasonable finished state and the reasonable construction state of the asymmetric cable-stayed bridge with single tower.
独塔不对称斜拉桥由于其不对称性,使得其合理成桥状态和合理施工状态的确定显得更为复杂。
The structural analysis for perfectly finished state and reasonable construction state of cable-stayed bridge is the focal and key point of the design.
斜拉桥理想成桥状态与合理施工状态的结构分析是其设计的重点和难点。
Taking Hebei street cable-stayed bridge as project background, this paper has a particular study to reasonable finished dead state.
本文以天津市河北大街斜拉桥为背景,对斜拉桥合理成桥状态的确定与施工控制展开研究。
In this paper, a concept of reasonable finished dead state of cable-stayed Bridges and existing methods of cable tension optimization for cable-stayed Bridges are firstly introduced.
本文首先介绍斜拉桥合理成桥状态的概念和现有的斜拉桥索力优化方法。
Then the forward calculation is also used to get the tensile cable forces of the construction process to gain a finished bridge state under the control of the former forces.
再以此索力作为正装计算的控制张拉索力,通过正装计算得到一个成桥状态。
When they got finished, they had 80 thousand miles of cable, enough to span the earth at its equator three times over.
他们完成这项工程,用了8万英里的钢索,足以绕地球赤道3圈还多。
The influences of dead weight of structure, temporary load, structural stiffness, creep and shrinkage in concrete effect on finished dead state of hybrid girder cable-stayed bridge were analysed.
以广州东沙大桥独塔边跨带辅助墩的混合梁双索面斜拉桥为例,采用对比分析的方法,定量分析结构自重、临时荷载、结构刚度、混凝土收缩徐变这些因素对混合梁斜拉桥成桥状态的影响。
The influences of dead weight of structure, temporary load, structural stiffness, creep and shrinkage in concrete effect on finished dead state of hybrid girder cable-stayed bridge were analysed.
以广州东沙大桥独塔边跨带辅助墩的混合梁双索面斜拉桥为例,采用对比分析的方法,定量分析结构自重、临时荷载、结构刚度、混凝土收缩徐变这些因素对混合梁斜拉桥成桥状态的影响。
应用推荐