• The finished cable will be easy to transport and install because of light weight.

    减轻电缆重量便于运输网络施工,减轻工人劳动强度;

    youdao

  • Finished cable should have factory name (code No.), type, voltage and other marks which should be resistant to wear.

    成品电缆应有制造厂(代号)、型号电压标志,标志擦。

    youdao

  • After the completion of 10-m HTS power cable in 2003, the building, commissioning and electrical test of 75-m HTS power cable have been finished in the end of 2004.

    继2003年完成10三相高温超导电缆之后,我们于2004年年底成功完成了75米高温超导电缆组装调试通电试运行。

    youdao

  • The connection cable will probably not be finished until next year.

    连接电缆明年以前可能完工。

    youdao

  • Based on the basic concept of the un-deformed pretension of cable, the optimization model of finished state with multi-objective and multi-constraint is used.

    基于不变形张力基本概念,建立斜拉桥成桥状态的多目标、多约束优化模型,并通过有限元程序求解成桥索力

    youdao

  • When the amusement park wasn't finished, I worked in the construction company then, and I was familiar to every equipment in its room. I know how to stop electricity of the cable car.

    之前那个游乐场盖好的时候刚好里面工程公司上班机房里面设备非常的熟,我知道怎么那个缆车断电

    youdao

  • Being asymmetric, it's more complex to determine the reasonable finished state and the reasonable construction state of the asymmetric cable-stayed bridge with single tower.

    对称斜拉桥由于对称性,使得合理成桥状态合理施工状态确定显得更为复杂

    youdao

  • The structural analysis for perfectly finished state and reasonable construction state of cable-stayed bridge is the focal and key point of the design.

    斜拉桥理想成状态合理施工状态结构分析设计重点难点

    youdao

  • Taking Hebei street cable-stayed bridge as project background, this paper has a particular study to reasonable finished dead state.

    本文以天津市河北大街斜拉桥背景,对斜拉桥合理成桥状态的确定与施工控制展开研究

    youdao

  • In this paper, a concept of reasonable finished dead state of cable-stayed Bridges and existing methods of cable tension optimization for cable-stayed Bridges are firstly introduced.

    本文首先介绍斜拉桥合理状态概念现有的斜拉桥索力优化方法

    youdao

  • Then the forward calculation is also used to get the tensile cable forces of the construction process to gain a finished bridge state under the control of the former forces.

    以此力作正装计算控制拉索力,通过正装计算得到一个状态

    youdao

  • When they got finished, they had 80 thousand miles of cable, enough to span the earth at its equator three times over.

    他们完成这项工程,用8万英里钢索足以地球赤道3圈还多。

    youdao

  • The influences of dead weight of structure, temporary load, structural stiffness, creep and shrinkage in concrete effect on finished dead state of hybrid girder cable-stayed bridge were analysed.

    广州东沙大桥独塔边跨带辅助墩混合双索面斜拉桥为例,采用对比分析的方法,定量分析结构自重临时荷载、结构刚度混凝土收缩变这些因素混合梁斜拉桥成桥状态影响

    youdao

  • The influences of dead weight of structure, temporary load, structural stiffness, creep and shrinkage in concrete effect on finished dead state of hybrid girder cable-stayed bridge were analysed.

    广州东沙大桥独塔边跨带辅助墩混合双索面斜拉桥为例,采用对比分析的方法,定量分析结构自重临时荷载、结构刚度混凝土收缩变这些因素混合梁斜拉桥成桥状态影响

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定