• The ground stratum is quite complex, with silt layer and fine sand layer mixed, so the construction is difficult to be carried out and the requirement of pit support is strict.

    基坑所处地层十分复杂较厚的淤泥细砂层,基坑支护要求高,施工难度大。

    youdao

  • Sewage flows through coarse bar screen and into inlet pump station drop pit, then is lifted to fine bar screen by drowned pumps.

    经过粗格栅污水汇入进水泵站水坑中,潜水泵提升格栅进水管。

    youdao

  • When the soil is fine, throw earth on the groove side (or material) 0.8m away from the pit (groove) edge with height more than 1m.

    土质良好时,的土方(材料),应槽(边缘0.8m以外,高度不宜超过1m。

    youdao

  • When the soil is fine, throw earth on the groove side (or material) 0.8m away from the pit (groove) edge with height more than 1m.

    土质良好时,的土方(材料),应槽(边缘0.8m以外,高度不宜超过1m。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定