D reject rework parts must be approved by the final inspector after passing inspection, in process inspection records "record", before packing.
不合格品返修件必须经终检员检验合格后,记录于《工序质检记录表》中,方可包装。
Provide final inspection and analysis record to Production Dept and Manufacturing Engineering Dept. as an orientation for quality improvement.
根据最终检验记录分析,提供给生产部和工程部,作为产品质量改进的方向。
Provide final inspection and analysis record to Production Dept and Manufacturing Engineering Dept. as an orientation for quality improvement.
根据最终检验记录分析,提供给生产部和工程部,作为产品质量改进的方向。
应用推荐