In order to resolve the problem of pit fill slope retaining, we not only met security needs but also concerned about saving the economy.
解决填土基坑边坡支护的问题,不仅要满足安全的需要,也要关注经济的节约。
The fill slope stability is more sensitive to the earthquakes from Min river fault than that from Xueshan fault, which is controlled mainly by the boundary conditions of the fill body.
受边界条件的控制,填体稳定性对来自岷江断裂方向的地震要比来自雪山断裂方向的地震更为敏感。
The subsidence of foundation and stability of fill slope are analyzed by means of three-dimensional finite element and Relative Suggestions are put forward for the project construction.
本文利用三维有限元法对地基沉降、填方边坡稳定性等问题进行了分析,对工程施工提出了相应的建议。
In-situ testing study on the mechanical behavior of soil nailing and the displacement characteristics of miscellaneous fill slope is carried out. A number of significant conclusions are proposed.
对杂填土内土钉的受力特点及边坡的位移特性进行了现场试验研究,得出了若干有意义的结果和结论。
Based on the practice, it introduces the methods of design of side slope protection alongside the high fill subgrade construction.
结合工程实践,介绍高填方路基边坡中填方路段派水设计、边坡防护设计的常用方法。
For example, it can apply to embankment reinforcement and embankment fill and rock slope defence and pavement crack prevention etc.
如在路堤加筋、台背路堤填土加筋、岩石边坡路基防护和路面裂缝的防治等。
When fill earth subgrade exercise part by part. The former part's gradient should be less than 1:5. Slope surface must be flat, so that, the construction machine can move from top to bottom.
填土路基分段作业时,先施工路段端部必须留不陡于1:5的坡面,坡面必须整平压实,以便施工机械上下及下段路基施工时开台阶。
This paper puts forward General scan-line polygon fill algorithm. This algorithm can use scan-lines of varied interval and varied slope to fill a polygon.
文章提出通用扫描线多边形填充算法,该算法可以有效地解决任意间距、任意倾角的扫描线对多边形的填充问题。
Stability of high fill embankment slope under multi-storey loads is studied in this paper.
本文就针对多层荷载作用下高填方边坡的稳定性进行了研究。
At last, according to the characteristics of hydraulic fill soils, two simplified methods based on the theory of effective stress are recommended for analysing the slope stability.
最后部分,根据冲填土料的特性,提出两种建立在有效应力原理基础上的简易边坡稳定分析方法。
Slope construction at upper reach of bedding materials of the concrete face rock-fill dam directly relates to the quality of concrete face, dam construction progress and cost of construction.
面板堆石坝垫层料上游坡面施工直接关系面板的质量、大坝施工进度及施工成本。
Slope construction at upper reach of bedding materials of the concrete face rock-fill dam directly relates to the quality of concrete face, dam construction progress and cost of construction.
面板堆石坝垫层料上游坡面施工直接关系面板的质量、大坝施工进度及施工成本。