The paper puts forward an evaluation model system to evaluate all processes of an automobile factory construction project.
提出了一个贯穿汽车工厂建设项目始终的评价体系,包括立项评价、中期评估和项目后评价。
To pre-evaluate the occupational hazards in the construction project of pharmaceutical workshop in a pharmaceutical factory.
对某制药公司制剂车间建设项目进行职业病危害预评价。
Adopt arch crest as air supply system, arrangement vents symmetry, and select 5 kinds of vents to arrange the project, according to the experiment request and factory premises construction form.
根据试验要求和厂房结构形式,本论文的模型试验在发电机层采用拱顶送风系统,风口对称均匀布置,选取5种风口布置方案。
The model built in this thesis can improve the profitability of the Ready-Mixed concrete factory and the quality of the construction project; get a win-win situation.
并得到一组不同目标值的调度方案,决策者可以根据实际情况选择合适的调度方案。
The project investigates the possibilities and variations of generic architecture through the research, design and construction of a factory building in Dongguan, PRD.
作品通过研究、设计和建造一座东莞的厂房,探讨通属建筑的可能与变奏。
The project investigates the possibilities and variations of generic architecture through the research, design and construction of a factory building in Dongguan, PRD.
作品通过研究、设计和建造一座东莞的厂房,探讨通属建筑的可能与变奏。
应用推荐