• Experience in factory audit would be advantage.

    有外贸或跨国鞋业公司的工作经验

    youdao

  • On-site factory audit is conducted according to SHAPR SHSPM audit requirements.

    工厂现场审核按照夏普shspm审核要求进行

    youdao

  • Customer is welcome to visit our new showroom and factory audit route on April, 2010.

    客户于2010年4月份来访参观样品路线

    youdao

  • Colax was set up extremely base on factory audit standard and now already passed audit by BV, STR, ITS, SGS, ect.

    工厂严格按照验标准设置目前已经通过BVSTRITSSGS公证行的验厂评估。

    youdao

  • Would you please confirm your acceptance of this factory audit by completing the questionnaire below and return it to us with the necessary documents for audit arrangement?

    完成所附问卷,回传问卷附上安排审核所需相关文件确认工厂接受本次审核。

    youdao

  • E. No report will issue to the factory after the audit, factory may retrieve the copy from applicant as your need.

    评估结束时,工厂不会得到报告方需要报告可以申请者得到复印件

    youdao

  • Please prepare the original documentation listed above for verification, if you factory can not provide on audit day, will be treat as problem. Thanks!

    以上正本文件烦请准备审核当天不能提供当作问题点。谢谢!

    youdao

  • Supplier/factory settle payment, provide filled questionnaire to the third party, and confirm audit date within 4 working days.

    贸易商/工厂4个工作日审核费用填写问卷调查表回传给第三机构,确认审核日期

    youdao

  • Audit finding summary will be confirmed with factory management at the end of the audit and a formal report will be sent to SHAPR Japan head office.

    审核结束时工厂管理层确认审核发现总结正式报告送往夏普日本总部。

    youdao

  • Upon successful completion of an ICTI certification audit, the factory will be awarded with an ICTI certificate as demonstration to having satisfied with the Code's provisions.

    工厂成功通过ICTI认证审核后,获得ICTI认证证书表明其符合上述守则要求。

    youdao

  • She, on the same day, successfully passed through the ISO9001:2000 certification audit by LRQA. She, the young factory, is XXX (Dalian)!

    这天是成功通过劳氏公司ISO9001:2000认证日子,她 ——年轻工厂XXX大连)!

    youdao

  • The further follow up audit in Aug 2008 will be conducted by ES . since the factory has orange assessments in last audit date in Feb 2008.

    工厂2008年2月第一次审核得到橙色的结果,其2008年8月的跟进审核须道德标准部进行

    youdao

  • Whether or not the factory has obtained the certificates of quality system certification (please provide the copy of the certificates) and indicate the date and conclusion of last audit).

    工厂质量体系是否通过质量体系认证?(如有,提供证书复印件) 。请说明最 近一次审核日期结论

    youdao

  • This is Target initial audit of a factory to determine if the factory is acceptable.

    Target进行首次决定工厂是否可以接受

    youdao

  • The audit recap is signed by both the auditor and factory management and a copy is left with the factory.

    然后厂概要”需要审核员工厂管理人员共同签署,且留一份拷贝于工厂。

    youdao

  • The factory has to initiate BSCI audit from the same audit company as before at their own cost.

    这家工厂开始BSCI审计来自同一公司的审计在自己的成本。

    youdao

  • The factory agrees that it will respect SGS code of conduct to maintain integrity of SGS auditor(s) to perform the audit assigned.

    工厂同意尊重SGS行为准则保持SGS审核员执行审核任务的公正和诚实

    youdao

  • During the 2nd re-audit, in any section, if the result is still "Critical", we may cancel the factory.

    第二次重新审计任何一节如果结果仍然危急”,我们可能会取消工厂

    youdao

  • During the 2nd re-audit, in any section, if the result is still "Critical", we may cancel the factory.

    第二次重新审计任何一节如果结果仍然危急”,我们可能会取消工厂

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定