• Seepage control in dam, design of freezing resistance for concrete face slab, new caulking water sealing material and surface coat on face slab are mainly presented.

    本文重点介绍坝体渗流控制混凝土面板抗冻设计,及新型缝止材料,面板表面涂料的研究。

    youdao

  • The prototype monitoring focal points of concrete face rockfill dam in Xiaoshan Hydropower Station are deformation and seepage of rockfill body, face slab and surrounding joints.

    小山水电站混凝土面板堆石坝原型观测重点是堆、面板周边变形流量观测。观测项目包括坝体变形、面板变形、渗流等。

    youdao

  • Sand and gravel are filled in different zones in embankment dam with concrete face slab and auxiliary embankment dam at Chalong Hydropower Station.

    查龙电站面板堆石坝坝体砾石副坝填筑不同填筑填筑沙砾石料。

    youdao

  • After check and assessment, construction quality for embankment dam with concrete face slab material filling at chalong Hydropower Station is excellent.

    检查评定查龙水电站面板填筑施工质量优良水平。

    youdao

  • The comprehensive quality for CFRD is: few cracks of concrete face slab, small seepage rate through the dam and a safe and reliable performance.

    混凝土面板堆石坝综合质量要求,混凝土面板裂缝大坝渗漏量少,大坝安全、可靠。

    youdao

  • The face slab rockfill dam of Shuibuya Hydropwer Station is the highest one being built in the world at present.

    水布垭水电站混凝土面板堆石坝,属目前在建世界第一高面板堆石坝。

    youdao

  • The reinforced concrete face-slab is adopted as impervious body by Long Tan RCC Dam.

    龙滩碾压混凝土重力坝采用钢筋混凝土面板作为防渗

    youdao

  • The technique of extruded concrete side wall is a new method for construction of upstream face slab of CFRD, which was first used during construction of the Ita dam in Brazil.

    挤压混凝土边墙技术混凝土面板堆石坝上游施工方法

    youdao

  • Tangpu reservoir is the only source of drinking water in Yushao Plain. Its east main dam is a large concrete face-slab rockfill dam and the problem of serious seepage exists.

    汤浦水库虞绍平原目前唯一饮用水源主坝为大型混凝土面板堆石坝存在严重渗漏现象

    youdao

  • The observation value of the ice pressure for the face slab far is smaller than the design value, and the ice pressure will not produce the bad effect on the face slab and dam body.

    分析结果表明山口面板堆石坝原型观测成果有限元计算成果基本符合,观测成果反映坝体碾压质量良好的。

    youdao

  • The concrete face slab as the water barrier of rockfill dam, it is very crucial in the overall design of rockfill dam with concrete face slab.

    面板作为面板堆石坝结构,面板堆石坝设计中占有重要地位

    youdao

  • The concrete face slab as the water barrier of rockfill dam, it is very crucial in the overall design of rockfill dam with concrete face slab.

    面板作为面板堆石坝结构,面板堆石坝设计中占有重要地位

    youdao