Influencing the fabrication quality and the production schedule, purchase is an important step conducted by purchasing department.
采购是直接影响制造质量和生产进度的重要环节,由供应部门进行采购实施。
Site schedule control is an important link of whole project control, and platform fabrication is a critical activity of Pinghu oil and gas field development project.
报告。平湖油气田工程现场进度控制是整个项目控制过程中的一个重要环节,平台建造是整个平湖油气田项目的关键活动之一。
E. door hardware Schedule: Prepared by or under the supervision of Installer, detailing fabrication and assembly of door hardware, as well as installation procedures and diagrams.
门用五金表:在安装人员的监督下准备,详细介绍门用五金的制造和装配,以及安装程序和图表。
E. door hardware Schedule: Prepared by or under the supervision of Installer, detailing fabrication and assembly of door hardware, as well as installation procedures and diagrams.
门用五金表:在安装人员的监督下准备,详细介绍门用五金的制造和装配,以及安装程序和图表。
应用推荐