• Influencing the fabrication quality and the production schedule, purchase is an important step conducted by purchasing department.

    采购直接影响制造质量生产进度重要环节供应部门进行采购实施。

    youdao

  • Site schedule control is an important link of whole project control, and platform fabrication is a critical activity of Pinghu oil and gas field development project.

    报告。平湖油气田工程现场进度控制整个项目控制过程中的重要环节平台建造是整个平湖油气田项目的关键活动之一。

    youdao

  • E. door hardware Schedule: Prepared by or under the supervision of Installer, detailing fabrication and assembly of door hardware, as well as installation procedures and diagrams.

    金表:在安装人员监督准备详细介绍门用五金制造装配以及安装程序图表

    youdao

  • E. door hardware Schedule: Prepared by or under the supervision of Installer, detailing fabrication and assembly of door hardware, as well as installation procedures and diagrams.

    金表:在安装人员监督准备详细介绍门用五金制造装配以及安装程序图表

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定