The equipment pipe and air and flue gas ducts etc. supplied by the contractor shall be made in maximum allowable dimensions to reduce the fabrication on site.
承包商供应的设备、管道、烟风道等必须做成容许的最大尺寸以减少现场加工和安装的工作量。
Take part in the design review during equipment fabrication phase and assist the on-site validation and installation of extrusion equipment.
在设备制作阶段和外国的设备供应商一同进行设计评估。并协助设备的现场验证和安装。
Another possibility is to use simple on-site fabrication facilities to aid quality assurance and to reduce construction time.
另一种可能性是使用简单的现场装配组件制造设备,保证质量并且降低施工时间。
This digital fabrication workflow allowed the many complex angles to be easily constructed on site from a precise kit of parts.
这个数字化的制造工作流程使得一些精确构件的复杂角度能很容易地在现场制造出来。
By site evaluation and mutual agreement of Safety, Maintenance, Production and Engineering, areas may be designated Shop Areas on construction or field fabrication projects after proper evaluation.
经过场所评估和安全、维修、生产和项目工程师的一致同意,在正确的评估后在建筑物或安装工程场可能指定为(维修)车间区。
By site evaluation and mutual agreement of Safety, Maintenance, Production and Engineering, areas may be designated Shop Areas on construction or field fabrication projects after proper evaluation.
经过场所评估和安全、维修、生产和项目工程师的一致同意,在正确的评估后在建筑物或安装工程场可能指定为(维修)车间区。
应用推荐