The paper expounds the measures for lowering the temperature in tunnel during the construction of the Qinling extra long tunnel.
本文主要论述了秦岭特长隧道施工降温的措施,为我国以后在修建长大隧道中的施工降温问题提供了经验。
The measurements of ground stresses by using the hydraulic cracking method within the deep boreholes were proceeded at the Qinling extra long tunnel district.
秦岭特长隧道地区采用水压致裂法进行了深钻孔的应力测量。
The results show that the ground stresses at Qinling extra long tunnel district have been expressed in some specialities mainly by the gravitational stress field.
结果表明,秦岭特长隧道地区地应力表现了以重力应力场为主的某些特征。
Taking Changjiang tunnel project in Shanghai as the background, this presentation systematically describes critical techniques of structure design on super large, extra long tunnel.
本报告以上海长江隧道为工程背景,系统地阐述了超大特长隧道结构设计的关键技术。
With the increase of extra-long tunnel construction, obviously, the empirical value can not keep up with the actual. So it needs to work out a method for natural wind computation.
随着特长隧道建设工程的增多,经验取值显然与实际不符,有必要建立一套隧道内自然风计算方法。
With the increase of extra-long tunnel construction, obviously, the empirical value can not keep up with the actual. So it needs to work out a method for natural wind computation.
随着特长隧道建设工程的增多,经验取值显然与实际不符,有必要建立一套隧道内自然风计算方法。