Factoring in wind data, he assumed that the lighter pieces of debris would lose momentum fastest along Chesley's projected track and land closest to the explosion site.
考虑到风力因素,他假定沿着切斯利的预测轨道,体积较小的陨石残片将最先丧失冲力,坠落地点也将最接近爆炸地点。
But too slow travel speed is directly related to slow drilling displacement and slow evacuation from the explosion site after drilling, which will influence the overall project's schedule.
行走速度太慢,钻孔移位慢,钻孔后撤离爆破现场的动作也慢,影响整个工程的进度。
But too slow travel speed is directly related to slow drilling displacement and slow evacuation from the explosion site after drilling, which will influence the overall project's schedule.
行走速度太慢,钻孔移位慢,钻孔后撤离爆破现场的动作也慢,影响整个工程的进度。
应用推荐