Therefore, it is necessary to take some reinforcing measures to guarantee safety of the tunnel itself and the adjacent existing pile foundation.
并且,邻接施工还将引起既有桩基产生偏向隧道水平方向的“拉伸”变形情况。
In this paper, the mechanical behaviour of a shield tunnel construction in urban metro adjacent to existing pile foundation is studied by using 3d FEM ANASYS numerical simulation method.
针对城市地铁新建隧道近接既有民房桩基的工程情况,进行了三维有限元数值模拟的施工力学行为研究。
Rather, the years pile on like blankets, existing all at once.
这么说吧,岁月像毯子一样堆积着,一直都存在着。
The UK alone has 10, 000 tons of nuclear waste, a pile which will increase 25-fold when the existing plants are decommissioned, with no solution in sight other than deep burial.
仅在英国,每年就要处理10000吨的核废料,当现有的核电厂退役的时候,产生的核废料将是如今的25倍。
This paper analyzes the major quality problems existing in pre-stressing concrete pipe pile construction and discusses their reasons. It also provides with quality control measures accordingly.
本文分析了预应力混凝土管桩工程存在的主要质量问题以及产生这些问题的原因,最后有针对性地提出了质量控制对策。
Give a more detailed description of the design principle that used protection with dug pile in transformation of existing railway bridge and culvert construction in parallel paragraph.
施工为例,较为详细地介绍了铁路既有线改造工程并行段桥涵施工中采用挖孔桩防护的设计原理。
Using slope shoring method combined borehole pile and high pressure jet grouting pile and anchor is an important mean to protect the safety of the existing buildings around the foundation pit.
采用钻孔桩及高压旋喷桩与锚索相结合的边坡支护方法,是保护基坑周边已有建筑物安全的一种重要手段。
Focusing on the existing quality problems for tubular pile foundation of a building project, the process and effect of all kinds of tubular piles were analyzed comprehensively.
针对某大厦工程管桩桩基存在的各类质量问题,全面分析各类管桩的处理过程及效果。
The partial low pile cap deep water foundations of Qinhong bridge are located in the flood discharge channel and near by existing civil bridge foundations in Nanjing.
南京市秦虹大桥的部分低桩承台深水基础位于泄洪河道中,并处于既有市政桥梁基础附近。
The paper analyses the quality problem existing in bottling pile, and presents the effective pre-control measures, which can provide reference for similar works.
针对灌注桩可能出现的质量问题,提出有效地预控措施,可供同类工程借鉴。
Steel tubular pile underpinning technology is an effective method to develop underground space in retrofitting of existing buildings.
利用微型钢管桩进行基础托换是既有建筑物地下增层改造的有效方法。
Compared with the existing methods, the proposed method could obtain more reasonable results which could decrease pile group effect and render a distribution of pile head load agreeable to the fact.
与现有的方法相比,该方法能够取得较好的结果,即使群桩之间被夸大的效应减小了,桩顶荷载的分布更趋于实际工况。
As underpinning technique has been mainly used in situation like tunnelling underneath existing buildings, or pile foundation and TBM turn around, so far as underground construction is concerned.
托换移位技术在地下工程中主要应用于隧道施工下穿既有建筑物、桩基以及盾构机掉头等工程。
The application of the chemical churning pile in the existing tracks culvert-jacking box;
结合工程实际,重点介绍了溶洞灌浆、旋喷桩和钢管桩在工程中的运用情况。
The application of the chemical churning pile in the existing tracks culvert-jacking box;
结合工程实际,重点介绍了溶洞灌浆、旋喷桩和钢管桩在工程中的运用情况。
应用推荐